From cassava harvest to industrial value

The Aligo Energies Cassava Refinery Complex is a phased development designed to convert cassava into industrial raw materials for food, manufacturing, pharmaceutical and renewable energy industries.

Situated within Nigeria's major cassava-producing belt in Abúlé Àrè, Alamala, Abeokuta, the project is positioned to maximise raw material availability while reducing logistics costs.

Discuss the project
Satellite view of the refinery site, with the project area marked

Satellite view of the project site. Select to enlarge.

Phase One

2026 to 2028

Industrial dried cassava chips facility

The foundation phase sets up a standardised supply of industrial-grade dried cassava chips for ethanol producers, animal-feed manufacturers and export markets.

  • 220 MTof fresh cassava processed daily
  • 16,200 MTapproximate annual production

Target markets

  • Ethanol producers
  • Animal-feed manufacturers
  • Export markets

Phase Two

After 2028

Expansion into higher-value derivatives

Building on Phase One's infrastructure and operating experience, the next stage widens the product range into more industrial and export opportunities.

  • Industrial ethanol
  • Cassava starch
  • Glucose syrup
  • Cassava flour
  • Acetone
  • Butanol

Phase Two is a future expansion stage. Product mix, timing and capacity depend on project development and investment decisions.

What Phase 1 includes

A complete production, power and logistics platform

  • Complete drying line

    The core production system, turning fresh cassava into high-grade dried chips for industry and export.

  • Quality assurance

    Two moisture content analysers give real-time checks against buyer specifications.

  • Power independence

    Two industrial generators keep operations running whatever the grid supply.

  • CNG energy infrastructure

    Two tube bundles and a pressure reduction system to improve fuel efficiency and cut operating costs.

  • Logistics and handling fleet

    A payloader, weighbridge, five tractor heads, four semi-trailers and three flatbed trailers, moving cassava from farm to plant to buyer.

  • Operating system

    A lean Odoo and Microsoft 365 setup for governance, traceability and accountability.

From our operations update. Read the full post on the blog.

Project highlights

Designed for the realities of local production

  • Strategic location

    Within the Ogun–Oyo cassava belt, close to raw materials and with lower logistics costs.

  • Energy-efficient operations

    CNG-powered operations help manage energy use, emissions and processing costs.

  • Direct OEM equipment sourcing

    Industrial equipment bought directly from original manufacturers.

  • Scalable infrastructure

    A phased plan that grows from dried chips into a wider range of derivatives.

  • Strong farmer integration

    Structured supply links with cassava farmers in the Ogun–Oyo belt.

Market and supply network

How product moves from farm to buyer

Map of the Aligo Energies market and supply network across Nigeria

Select the map to enlarge.

Help move Phase 1 to completion

We are looking for strategic equity investment to complete Phase 1 infrastructure and operational readiness at the Abeokuta site.

Partner with us Request project documents
Phase 1 constructionabout 75%

Current opportunity: ₦75M strategic equity investment.